S1Industry · Case study

Automation and control panels for ski lifts and ropeways

Control panels, software and revamping for chairlifts, drag lifts and skier conveyors.

AThe industry

A ski lift must run every day of the season, in extreme conditions and with passenger safety as the absolute priority. Simetec supports manufacturers and operators with the electrical and automation side: control panels, control software, diagnostics and revamping of existing installations, planned during the closed months.

BIndustry challenges

What really matters.

  • 01

    In-season availability

    A stop in peak season means closed slopes and lost revenue: diagnostics and reliability are decisive.

  • 02

    Harsh environment

    Frost, humidity, temperature swings and lightning put panels and components to the test.

  • 03

    Obsolete components

    Many lifts in operation use discontinued electronics and PLCs with hard-to-find spares.

  • 04

    Short work windows

    Work must be concentrated in summer and coordinated with the manufacturer and operations manager.

CCase study

Revamping of a chairlift control panel

Sector
Ski lifts and ropeways
Client
Ropeway operator, Alpine region
  1. P

    Problem

    A four-seater chairlift suffered intermittent stops that were hard to diagnose. The control PLC and operator panel were discontinued, and the wiring documentation no longer matched years of accumulated changes.

  2. A

    Analysis

    During the spring closure we surveyed the entire electrical system of the drive and return stations, rebuilt the diagrams in CAD and recorded line-circuit signals with dedicated instruments, identifying interference and degraded contacts behind the stops.

  3. S

    Solution

    We designed and wired a new control panel in our workshop, migrated the software to a new-generation PLC and built an operator panel with event history and guided diagnostics. Installation was coordinated with the manufacturer and operations manager in the summer window.

  4. R

    Result

    The lift reopened on schedule. Intermittent stops were eliminated and station staff now find the cause of every anomaly directly from the panel, with much shorter restart times.

Results
  • Reopened on schedule
  • Intermittent stops eliminated
  • Guided diagnostics at the station

EFrequently asked questions

Frequently asked questions

Do you work on ski lifts already in operation?

Yes. We work on existing installations for revamping, panel upgrades, software migration and fault finding, in coordination with the manufacturer and operations manager.

When is the best time for revamping?

During the closed months, preparing panels and software in the workshop well in advance: downtime is concentrated into a few weeks and the lift reopens on time.

Do you also work on skier conveyors and small lifts?

Yes, we handle the electrical and automation side of skier conveyors, drag lifts and smaller installations too.

→Contact

A plant to design, upgrade or bring back to life?

Tell us about the problem. We reply with a technical assessment, not a generic quote.