Every project starts from a real problem. We tell it the way we work: problem, analysis, solution, result.

Revamping of a packaging line
Case study 01

Revamping of a packaging line

Sector
Food
Client
Food manufacturer, Mantua province
  1. P
    Problem

    A packaging line in excellent mechanical condition suffered increasingly frequent stops: the PLC and operator panel were discontinued, spare parts unobtainable and wiring diagrams out of date.

  2. A
    Analysis

    We carried out a full survey of the plant, rebuilt the diagrams in CAD and analysed the existing software to document cycles, interlocks and alarms. Measurements on drives and auxiliary circuits identified the causes of the recurring stops.

  3. S
    Solution

    A new control panel designed and wired in our workshop, PLC and HMI software migrated to a current platform and redesigned alarm diagnostics. Everything was prepared and simulated beforehand, then installed during the planned summer shutdown.

  4. R
    Result

    The line returned to production on schedule, with available spare parts, updated documentation and diagnostics that lead maintenance staff straight to the cause of a problem.

Turnkey electrical system for a special machine
Case study 02

Turnkey electrical system for a special machine

Sector
Automatic machine building
Client
Machine builder, Northern Italy
  1. P
    Problem

    A special-machine builder coordinated different suppliers for electrical design, panel, wiring and software. Every hand-over caused delays and revisions during start-up.

  2. A
    Analysis

    Together with the client's engineering team we analysed functions, safety requirements and delivery times, defining a single electrical and software architecture shared from the outset.

  3. S
    Solution

    Simetec handled the entire electrical side in-house: CAD diagrams, automation panel, on-board wiring, PLC and HMI software and programming of the collaborative machine-tending robot.

  4. R
    Result

    One technical contact, no gaps between phases and a start-up with no major revisions. The approach has been repeated on subsequent machines.

Replacement board for discontinued electronics
Case study 03

Replacement board for discontinued electronics

Sector
Industrial testing
Client
Metalworking company, Lombardy
  1. P
    Problem

    A test bench had stopped because of a failed high-speed counter board that was no longer manufactured. The original maker could provide neither spares nor documentation.

  2. A
    Analysis

    In our lab we analysed the failed board and a working unit, reconstructing the schematic and characterising the signals with oscilloscope and function generators.

  3. S
    Solution

    We designed a new board compatible in connections and behaviour, built with current components and verified with functional tests on the bench and in the real application.

  4. R
    Result

    The test bench is back in operation and the client now has documented spare boards, removing the risk of another long stoppage.

+From the workshop

Our work.

→Contact

A plant to design, upgrade or bring back to life?

Tell us about the problem. We reply with a technical assessment, not a generic quote.